according to guidelines issued by ZVEH and VDEW
RequiredMeasuring & Test Instrument | per DIN VDE | First-Time Users | Standard | Efficient Work |
---|---|---|---|---|
Test base with permanently integrated measuring instr. | 0104 | ![]() |
![]() |
![]() |
Tester for electr. devices | 0701-0702 | ![]() |
![]() |
![]() |
Voltage meter to at least 600V Current meter to at least 15AContinuity tester |
0410 0410 0403 |
![]() |
![]() |
![]() |
Clamp meterto at least 300 A | ![]() |
![]() |
![]() |
|
Insulation measuring instr. | 0413-T1 | ![]() |
![]() |
![]() |
Insulation measuring instr. Tester for RCCBs Resistance measuring instr. Loop resist. measuring instr. Phase sequence indicator |
0413-T2 0413-T3 0413-T4 0413-T6 0413-T7 |
![]() |
![]() |
![]() |
Earth tester | 0413-T5 | ![]() |
![]() |
|
1-pole voltage tester 2-pole voltage tester |
0680-T5 0682-T401 |
![]() |
![]() |
![]() |
Continuity tester | 0403 | ![]() |
![]() |
|
Phase Sequence Indicator | 0413-7 | ![]() |
![]() |
![]() |